Zhengzhou Protech
Home > News

Продукт

Свяжитесь с нами

Оставить сообщение

Свяжитесь с нами

Все продукты настраиваемы, оставьте сообщение немедленно, мы ответим как можно скорее.

Имя

Телефон/WhatsApp

Электронная почта*

Страна *

Сырье

Сообщение *

Код проверки *

Я не вижу ясно, освежить

Matters needing attention in the operation of box atmosphere furnace

   Most of Zhengzhou Nuotai Technology’s recent customers use box-type vacuum heat treatment furnaces, which are basically used in various colleges, universities, laboratories, factories and mining enterprises, for chemical composition analysis, physical determination, and sintering of metal materials and ceramics. It is used for heating, firing, drying and heat treatment of melting, small and medium-sized steel parts.
box atmosphere furnace
   However, these problems are often encountered during the operation of the box-type vacuum heat treatment furnace. The following Nuotai Technology summarizes the following common problems in the operation of vacuum heat treatment furnace procedures:2diMuffle Furnace,Tube Furnace,Vacuum Furnace,Atmosphere Furnac
1) Be sure to disconnect the switch power supply when loading and taking samples to prevent electric shock;2diMuffle Furnace,Tube Furnace,Vacuum Furnace,Atmosphere Furnac
2) Do not exceed the maximum temperature of the box-type vacuum heat treatment furnace during use;2diMuffle Furnace,Tube Furnace,Vacuum Furnace,Atmosphere Furnac
3) It is forbidden to pour all liquid into the furnace;2diMuffle Furnace,Tube Furnace,Vacuum Furnace,Atmosphere Furnac
4) The opening time of the furnace door should be as short as possible when loading and taking samples to increase the life of the electric furnace;2diMuffle Furnace,Tube Furnace,Vacuum Furnace,Atmosphere Furnac
5) Wear special gloves when loading and taking samples to prevent burns;2diMuffle Furnace,Tube Furnace,Vacuum Furnace,Atmosphere Furnac
5) Do not put samples stained with oil and water into the furnace; do not use clamps stained with oil and water to load samples;2diMuffle Furnace,Tube Furnace,Vacuum Furnace,Atmosphere Furnac
6) Do not touch the electric furnace and surrounding samples at will;2diMuffle Furnace,Tube Furnace,Vacuum Furnace,Atmosphere Furnac
7) The samples should be placed in the middle of the furnace, neatly arranged, and do not pile up;2diMuffle Furnace,Tube Furnace,Vacuum Furnace,Atmosphere Furnac
8) Switch off the power supply and water source after use;
2diMuffle Furnace,Tube Furnace,Vacuum Furnace,Atmosphere Furnac